our projects

custom projects

YAS MARINA ABU DHABI - F1 RACE TRACK

Control of all the track lights as well as the 44 generators that power the lights. 4 KNX lines of an average of 1,8 km all controlled by a central server PC.

AEK ARENA 

Full control of all common areas and the Pillars with monitoring of electricity loads and consumption. Remote access via KNX web server.

SPYROS KYPRIANOU ATHLETIC CENTER

Full lighting controls of all external and internal areas of the stadium.

MEDOCHEMIE PEGASUS OFFICES

Total system integration. Lights, Shading, VRV, BMS.

RIALTO THEATRE

BMS and CHILLER BACNET Integration

HOTELS

COLUMBIA BEACH RESORT

48 rooms automation, common areas and 2 villas and the Apollo restaurant in the resort.

ALASIA BOUTIQUE HOTEL

BMS and VRV Integration.

GRAND RESORT

BMS and HITACHI Integration. CCTV system with 64 cameras.

CONSTANTINOS THE GREAT BEACH HOTEL

Full room automation.

MEDITERRANEAN HOTEL

BMS and VRV Intergration

RESIDENTIAL